Case Study: Sea World Underground Storage Tank Replacement (San Diego, CA)

by Mar 30, 2021Case Study

Intro

Project Description

SeaWorld San Diego had an existing fuel system that needed updating. Western Pump removed one (1) 10,000 gallon UST system and replaced it with one (1) AB-2481 continuously monitored 10,000 gallon UST system with double wall sumps, product, vent, and vapor piping, electrical controls and monitoring. The project was completed March of 2021 and included demolition, underground tank replacement, backfilling, dispenser replacement, fuel management installation, start-up and commissioning.

SeaWorld San Diego Fuel System Installation | Western Pump

Details

Project Features

  • One (1) 10,000 gallon underground storage tank

  • One (1) 10,000 gallon AB-2481 Continuously Monitored UST Addition

  • One (1) Gasboy 9800 Series twin hose, twin product, gasoline/diesel dispenser

  • New Veeder-Root sensors and probes
  • Fuel System Electrical

  • Fuel Management System

  • Testing, Start-Up, and Commissioning

SeaWorld San Diego Fuel System Installation | Western Pump
SeaWorld San Diego Fuel System Installation | Western Pump
SeaWorld San Diego Fuel System Installation | Western Pump

Services Provided

Procure Equipment

Demo

Tank Removal

Tank Installation

Fuel System Electrical

Tank Monitoring System

Drive Slab Installation

Dispenser Installation

Flow Meter Calibration

Fuel Management Installation

Crash Protection

Start-up & Initialization

Regulatory Inspections