INTRO

Project Description

Western Pump is doing a raze and rebuild for an older Love’s Travel Stop located in Buckeye, AZ. This project is currently under construction.

The scope of work included excavation, trenching, backfill, fuel system installation, fuel system electrical testing, start-up, and commissioning, and lube equipment installation, testing, start-up, and commissioning and Lube Equipment Installation, Testing, Start-Up, and Commissioning.

DETAILS

Project Features

  • Auto Fueling Area – One (1) 30,000-gallon regular unleaded single-compartment Underground Storage Tank (UST) and One (1) 20,000-gallon two-compartment Underground Storage Tank (UST) (12k Diesel / 8k Premium Unleaded Gasoline)
  • Diesel Truck Fueling Area – One (1) 20,000-gallon single-compartment Underground Storage Tank (UST) (Diesel Exhaust Fluid), One (1) 6,000-gallon single-compartment Oil Water Separator and Four (4) 12,000-gallon UL-2085 Aboveground Storage Tanks
  • Seven (7) Multi Product Dispensers (3+1 Blenders)
  • Six (6) Master/Satellite + DEF Dispensers
  • Four (4) turbine tank sumps
  • Underground Pipe Installation
  • Back Fill Tank and Pipe Excavation
  • Tank Monitoring System Equipment
  • Testing, Start-Up, and Commissioning
  • One (1) owner provided Lube Tank
  • Ten (10) medium pressure Oil Pumps
  • One (1) Grease Pump
  • One (1) Waste Oil Pump
  • One (1) 10 Reel Mounting Bracket
DCIM100MEDIADJI_0201.JPG
DCIM100MEDIADJI_0190.JPG

Services Provided

  • Saw cut, breakout, remove concrete
  • Tank Installation
  • Piping Installation
  • Fuel Dispenser Installation
  • Tank Monitoring System Upgrade
  • Drive Slab Installation
  • Flow Meter Calibration
  • Lubrication System Installation
  • Start-up & Initialization
  • Regulatory Inspections
  • Close-out Documentation