Intro

Project Description

The QuikTrip Store located in Chandler, Arizona had two (2) 13,000 gallon single-compartment diesel underground storage tanks added to its existing site away from the existing tank farm. This site also had a full flex-pipe, re-boot, and re-pipe done for gasoline, premium, and diesel. The project was completed on in August of 2021. The scope of work included demolition, excavation and trenching, a diesel tank addition, a re-pipe and re-boot, dispenser removal and installation, backfilling, tank monitor upgrades, fuel system electrical, testing, start-up, and commissioning.

Western Pump Case Study: QuickTrip Chandler, AZ

Details

Project Features

  • Two (2) 13,000 Gallon Underground Storage Tank (UST)
  • Two (2) single-walled, turbine tank sump
  • Eight (8) Gilbarco Encore 700s
  • Underground Pipe Installation
  • Re-Pipe and Re-Boot
  • Back Fill Tank and Pipe Excavation
  • Tank Monitoring System Equipment
  • Fuel System Electrical
  • Testing, Start-Up, and Commissioning
QuikTrip | Single-Compartment Diesel Underground Tank Installation (Tolleson, AZ) | Western Pump
Western Pump Case Study: QuickTrip Chandler, AZ

Services Provided

Procure Equipment

Saw cut, breakout, remove concrete

Tank Installation

Piping Installation

Fuel System Electrical

Fuel Dispenser Removal

Fuel Dispenser Installation

Tank Monitoring System Upgrade

Drive Slab Installation

Flow Meter Calibration

Start-up & Initialization

Regulatory Inspections

Close-out Documentation